Workshop Manual

Table Of Contents
0312 1644 - 0138
3/4
© 11/2004
5
5 Job card overview
5.1 Sorted alphabetically
2011
Activity Job card Maintenance group
Assemble and disassemble engine on assembly stand W 00-05-01 Engine general
Check and set valve clearance W 01-01-01 Cylinder head
Check compression W 00-02-06 Engine general
Check V-belt, renew (in FL and BFL engines) W 12-02-01 Other components
Check V-belt, renew (in FM and BFM engines) W 12-02-01 Other components
Disassemble and complete, check toggle lever and toggle
lever block
W 01-02-06 Cylinder head
Remove and install air intake pipe W 06-07-03 Exhaust system / Charging
Remove and install cable harness W 13-01-02 Electrical components
Remove and install charge pressure-depedent full load stop
(LDA)
W 07-08-02 Fuel system
Remove and install cooling blower W 09-11-01 Cooling system
Remove and install crankcase bleeding W 03-01-11 crankcase
Remove and install cylinder head W 01-04-04 Cylinder head
Remove and install exhaust manifold W 06-01-05 Exhaust system / Charging
Remove and install flywheel W 12-06-01 Other components
Remove and install fuel filter console W 07-10-08 Fuel system
Remove and install fuel lines (with Bosch injection pumps) W 07-10-06 Fuel system
Remove and install fuel lines (with leak fuel line) W 07-10-06 Fuel system
Remove and install fuel pump W 07-11-01 Fuel system
Remove and install generator (in FL and BFL engines) W 13-02-03 Electrical components
Remove and install generator and holder
(in FM and BFM engines)
W 13-02-03 Electrical components
Remove and install helical heater plugs W 13-06-01 Electrical components
Remove and install hydraulic pump W 12-08-02 Other components
Remove and install injection valves W 07-07-01 Fuel system
Remove and install lifting magnet (shutoff magnet) W 11-00-03 Monitoring system