Operation Manual
Table Of Contents
Hours.
Date
Date
Signaure / Stamp Hours
Signaure / Stamp
5
-
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
Routine Maintenance 5.3 Completed Maintenance Jobs
50-150
*
125
375
625
875
1125
1375
1625
1875
2115
2375
2625
* Commissioning new and overhauled engines
The maintenance jobs duly completed can be recorded in the above table.