Operation Manual
Before the journey
4
27Caravan - 10-12 - EN
z Water system filled up to 90% (water tank and pipes)
z Gas bottles filled up to 90%
z A full heating system
z A full toilet flushing system
z The power cables for the 230 V power supply
z The installation kit for an auxiliary battery if an auxiliary battery can be used
The waste water and sewage tanks are empty.
The manufacturer specifies the mass in ready-to-drive conditions in Field G of the
vehicle documents.
Example for calculating
the basic equipment with
two gas bottles
Water tank with 40 l 40 kg
Toilet cistern with 10 l + 10 kg
Gas bottles (2 x 11 kg
gas
+ 2 x 14 kg
bottle
) + 50 kg
230 V power cable + 4 kg
Installation kit for auxiliary battery + 20 kg
Total = 124 kg
Example for calculating
the basic equipment with
one gas bottle
Water tank with 40 l 40 kg
Toilet cistern with 10 l + 10 kg
Gas bottles (1 x 5 kg
gas
+ 1 x 6 kg
bottle
) + 11 kg
230 V power cable + 4 kg
Installation kit for auxiliary battery + 20 kg
Total = 85 kg