Operation Manual

1
3C
aravan - 11-06 - DET-0030-05EN
Guarantee
1
We reserve the right to modify the inspection plan.
1.5 Inspection plan for water ingress test
19 Brake cable assembly Visual check Every two
years
20 Chassis underbody Check bolts are firmly
secured
Every two
years
21 Gas system Official gas inspection Every two
years
Pos. Component Activity Interval
Pos. Component Activity
1.1 Wheel housing Visual check
1.2 Rear wall floor plateau connection Visual check
1.2.1 Side wall in the direction of travel left connection Visual check
1.2.2 Side wall in the direction of travel right connec-
tion
Visual check
1.3 Front wall floor plateau connection Visual check
1.3.1 Side wall in the direction of travel left connection Visual check
1.3.2 Side wall in the direction of travel right connec-
tion
Visual check
1.4 Side wall floor plateau right connection Visual check
1.5 Side wall floor plateau left connection Visual check
1.6 Connection to driver's cabin Visual check
1.7 Base frame with base frame cut-outs Visual check
1.8 Check the status of the outer metal sheets Visual check
1.9 Check the status of the window rubbers, expan-
sion joints, sealing joints
Visual check
2.1 Measure the floor plateau at this connection
point with a moisture measuring device, write
down the corresponding values with the date of
the assessment. Prescribed maximum values –
up to 20 % normal.
If the values are above 20 % check if it is due to
accumulated condensation.
Measuring
2.2 Measure inside the vehicle (walls, window sec-
tions, roof, etc.), note changes in the colour of
the decor. Prescribed maximum values – up to
20 % normal.
If the values are above 20 % check if it is due to
accumulated condensation.
Measuring
3.1 Wheel housing Spray with Dethleffs
special weatherproof
solution
3.2 Rear wall floor plateau connection Spray with Dethleffs
special weatherproof
solution