Specifications

5.7.5. Test Result
Model Number I-7520A
Test Item Voltage Dips and Interruption Measurement
Test Mode Mode 1
Angle 0~360 degree Step 45 degree
Date of Test 2014/02/10 Test Site TE08
Test Voltage
(Vac)
Voltage Reduction
(%)
Test Duration
(ms)
Performance Criterion Test Result Observation
>95 10 A B C Pass Note1
30 500 A B C Pass Note1
230
>95 5000
A B C Pass Note2
>95 10 A B C Pass Note1
30 500 A B C Pass Note1
100
>95 5000
A B C Pass Note2
Note 1: The acceptance criteria were met, and the EUT passed the test.
Criterion A : Operate as intended during and after the test
Criterion B : Operate as intended after the test
Criterion C : Loss/Error of function
Additional Information
EUT stopped operation and could / could not be reset by operator at dBuV(V) at
frequency
MHz.
No false alarms or other malfunctions were observed during or after the test.
Note 2: The power is temporary off and can be reset by the operator.
A Test Lab Techno Corp.
Report Number: 1402CE13-01
70 of 153