5.3.4. Test Procedure
a) Both positive and negative polarity discharges were applied.
b) The length of the “hot wire" from the coaxial output of the EFT generator to the terminals on the
EUT should not exceed 1 meter.
c) The duration time of each test sequential was 1 minute.
d) The transient/burst waveform was in accordance with EN 61000-4-4, 5/50ns.
5.3.5. Test Result
Model Number I-7520A
Test Item Electrical Fast Transient/Burst
Test Mode Mode 1
Date of Test 2014/02/05 Test Site TE08
Test Point Polarity
Test Level
(kV)
Inject Time
(Second)
Inject Method
Performance
Criterion
Result
L ± 1 60 Direct A B PASS
N ± 1 60 Direct A B PASS
PE ± 1 60 Direct A B PASS
L+N ± 1 60 Direct A B PASS
L+PE ± 1 60 Direct A B PASS
N+PE ± 1 60 Direct A B PASS
L+N+PE ± 1 60 Direct A B PASS
LAN Port ± 0.5 60 Direct A B PASS
Note: The testing performed is from lowest level up to the highest level as required by standard, but
only highest level is shown on the report.
Criterion A : Operate as intended during and after the test
Criterion B : Operate as intended after the test
Criterion C : Loss/Error of function
Additional Information
EUT stopped operation and could be reset by itself at kV of Line.
No false alarms or other malfunctions were observed during or after the test.
A Test Lab Techno Corp.
Report Number: 1402CE13-01