4 Drawer Base Cabinet Assembly Instructions SKU Reference # Finish 211-4581 211-4582 211-4584 211-4682 4039 4094 4056 14598 White Java Cottage Charcoal Tools Needed: hammer screwdriver 01-13958-00 11/20
SAFETY PRECAUTIONS WARNING • This unit contains small parts which could be a choking hazard for small children. Children should be under adult supervision at all times or serious injury could occur. • Always unload unit prior to moving the unit. The weight of personal belongings can cause the unit to become unstable and either tip or collapse. Serious bodily injury and/or damage to personal belongings may occur. • Do not overload unit.
HARDWARE (H1) x 22 cam post (H2) x 14 15 mm cam lock (H3) x 16 funnel screw (H4) x 6 wide dowel 8 mm x 30 mm (H5) x 32 euro screw (H6) x 20 small nail (H7) x 4 nail-on foot (H8) x 4 cover cap (H9) x 2 back anchor (H10) x 1 small screw #8 x 1/2 in. (H11) x 1 nylon zip tie (H12) x 1 long screw #8 x 1-1/2 in. (H13) x 2 stacking bracket (H14) x 8 medium screw #8 x 7/8 in.
DESCRIPTION QUANTITY A B C D E F G left side panel right side panel back cleat bottom shelf top shelf back panel trim 1 1 1 1 1 1 2 H I J K L right drawer side drawer back left drawer side drawer bottom drawer front 4 4 4 4 4 E G C F A B I J K L H G D X4 4
STEP 1 (H2) B (H1) (H1) x 6 cam post (H2) x 4 15 mm cam lock (H4) A (H4) x 4 wide dowel 8 mm x 30 mm 1. Secure cam posts (H1) into holes as shown. PLEASE NOTE: Cam post is secure when threads on screw are not showing. 2. Insert cam lock (H2) and press to bottom of hole. Ensure arrow on cam lock is pointing towards outer edge as shown. 3. Insert dowels (H4) into holes as shown.
STEP 2 (H1) (H4) E D (H2) C (H1) x 4 cam post (H2) x 10 15 mm cam lock (H4) x 2 wide dowel 8 mm x 30 mm 1. Secure cam posts (H1) into holes as shown. PLEASE NOTE: Cam post is secure when threads on screw are not showing. 2. Insert cam lock (H2) and press to bottom of hole. Ensure arrow on cam lock is pointing towards outer edge as shown. 3. Insert dowels (H4) into outer holes of top shelf (E) as shown.
STEP 3 C B D 1. Align side panel (B) with appropriate holes in bottom shelf (D) and back cleat (C) as shown and install. 2. Tighten cam locks to secure side panel (B) to back cleat (C) and bottom shelf (D).
STEP 4 C A D 1. Align side panel (A) with appropriate holes in bottom shelf (D) and back cleat (C) as shown and install. 2. Tighten cam locks to secure side panel (A) to back cleat (C) and bottom shelf (D).
STEP 5 E B A 1. Align top shelf (E) with appropriate holes as shown and install. 2. Tighten cam locks to secure side panels (A & B) to top shelf.
STEP 6 G (H6) x 20 small nail (H7) x 4 nail-on foot 1. Place back panel (G) onto unit (making sure the finished side of backer faces down) and center horizontally and vertically. 2. Nail the back panel (G) into position using small nails (H6). Avoid angling nails. 3. Gently tap the nail-on feet (H7) approximately 1 in. away from each corner. (Note: 4 drawer unit should always be on the bottom if stacked.
STEP 7 G G G G NOTE: Thicker edges of trim should be positioned towards the top and bottom ends of the unit unless stacking, then choose either option 1 or 2 for the adjoining trim preference. option 1 option 2 (H1) x 4 cam post 1. Secure cam posts (H1) into holes as shown. PLEASE NOTE: Cam post is secure when threads on screw are not showing. 2. Flip the unit over so the open side is facing up. 3. Align the cam posts in the trim with the appropriate holes as shown and install.
STEP 8 J (H17) (H17) H H K J (H3) I (H1) L (H18) L (H15) (H5) (H1) x 8 cam post 1. 2. 3. 4. 5. 6. 7. 12 (H17) x 8 12 mm cam lock (H18) x 8 dowel 6 mm x 30 mm (H15) x 4 inside drawer glide (H5) x 16 euro screw (H3) x 16 funnel screw Insert cam lock (H17) into drawer sides and press to bottom of hole. Ensure arrow on cam lock is pointing towards outer edge as shown. Secure drawer sides (H & J) to drawer back (I) using funnel screws (H3).
STEP 9 (H16) x 4 outside drawer glide (H5) x 16 euro screw 1. Secure the outside drawer glides (H16) to the assembled cabinet as shown using four euro screws (H5). Repeat for the remaining glides. 2. Insert the four assembled drawers into the cabinet as shown.
STEP 10 WALL (H11) (H9) (H8) x 4 cover cap 1. 2. 3. 4. 14 (H12) (H10) (H9) x 2 back anchor (H10) x 1 small screw #8 x 1/2 in. Install four cam cover caps (H8) by pressing them into the cam locks as shown. Use 1/2 in. screw (H10) to secure back anchor (H9) to top shelf. Place back anchor (H9) against wall stud as shown. Use 1-1/2 in. screw (H12) to secure back anchor to wall. Secure plastic tie (H11) to prevent unit from tipping. (H11) x 1 nylon zip tie (H12) x 1 long screw #8 x 1-1/2 in.
STEP 11 The 4 drawer cabinet is intended to be a base cabinet only. It should not be on top when stacked. (H13) x 2 stacking bracket 1. 2. 3. 4. (H14) x 8 medium screw #8 x 7/8 in. NOTE: If stacking this unit, align the units on top of each other as shown. Install stacking brackets (H13) to the back side of the units using the stacking screws (H14). Be sure to center the bracket to the side panels before screwing them in.