Technical data

29
A100 OPERATING MANUAL
© 2002 Design, 2012 Doc. No. 12-7271-r01 (4/25/12)

 segments
• No Deco Normal zone (green) 1 to 13 = 5 to 65% allowable tissue loading.
• No Deco Caution zone (yellow) 14 to 19 = 70 to 95% allowable tissue loading.
• Decompression zone (red) 20 = 100% tissue loading.
 60 FT (18 M) & Shallower Deeper than 60 FT (18 M)
segments FPM MPM segments FPM MPM
0 0 - 10 0 - 3 0 0 - 20 0 - 6
Normal zone (green) 1 11 - 15 3.5 - 4.5 1 21 - 30 6.5 - 9
Normal zone (green) 2 16 - 20 5 - 6 2 31 - 40 9.5 - 12
Normal zone (green) 3 21 - 25 6.5 - 7.5 3 41 - 50 12.5 - 15
Caution zone (yellow) 4 26 - 30 8 - 9 4 51 - 60 15.5 - 18
Too Fast zone (red) 5 (all) > 30 > 9 5 (all) > 60 > 18
 Range: Resolution:
Altitude Level Sea, L2 to L7 1 (level)
Time to Fly 23:50 to 0:00 hr:min 1 minute
Time to Desaturate 23:50 to 0:00 hr:min 1 minute
Temperature 0 to 99°F (-18 to 60°C) 1°F (C)
Depth 0 to 330 FT (100 M) 1 FT (0.1 M )
Surface Interval Time 0:00 to 23:59 hr:min 1 minute
Dive Number 0 to 12 1 (dive)
EDT 0 to 9:59 hr:min 1 minute
DTR 0 to 9:59 hr:min 1 minute
FO2 Air, 21 to 50 % 1 %
PO2 0.00 to 5.00 ATA .01 ATA
O2 0 to 100 % 1 %
Safety Stop Time 3:00 to 0:00 min:sec 1 second
Deco Stop Time 0:00 to 9:59 hr:min 1 minute
Deco Total Ascent Time 0:00 to 9:59 hr:min 1 minute
Violation Countdown Timer 23:50 to 0:00 hr:min 1 minute
SPECIFICATIONS (CONTINUED)




