INSTALLATION
3/8” anchors are shipped with the rack. Place 
the rack in the desired location. Use a marker 
or pencil to outline the holes of the flange onto 
the base material. Drill the holes in accordance 
with the specifications shipped with the anchors. 
Make sure the holes are at least 3” away from 
any cracks in the base material. Racks should be 
mounted 25” from the ground at the center of the 
rack.
RECOMMENDED BASE MATERIAL
Solid concrete is the best base material. Brick, block, and wood 
stud walls may be acceptable. Metal stud walls are not an 
acceptable material for installation. Before installing make sure 
nothing is behind the wall that could be damaged by drilling and 
that the base material is strong enough to support a fully loaded 
rack. Tell your Dero representative what kind of base material you 
are installing the Switchback™ into so the proper anchors can be 
shipped with the rack.
TOOLS NEEDED
Tape Measure
Marker or Pencil
Masonry Drill Bit
Drill (Hammer drill recommended)
Hammer
Wrench or ratchet 9/16”
Level
SWITCHBACK™
Installation Instructions – Wall Mount
Concrete Spike
Sleeve Anchor
Titen Anchor
Lag Screw
(wood install)