Technical data
--- 11 ---
9. ADJUSTMENT OF COMPONENTS
9-1. Bevel Angle Adjustment
When shipped from the factory, the heights of 6 mm
bolt (A) and 6 mm bolt (B) are adjusted so that the saw
blade section (head) will stop at 0 (right-angle) and 45
to the left. To change the head stop positions, instruct
the customer to adjust the height of 6 mm bolt (A) and
6 mm bolt (B) as described below.
As illustrated in Fig. 10 and Fig. 11, adjustment of the
bevel angle can be accomplished by loosening the 6
mm nut (lock nut) and turning 6 mm bolt (A) or 6 mm
bolt (B) to raise it or lower it by an appropriate
dimension to change the position at which it comes in
contact with angle regulator.
[Caution] On completion of adjustment, ensure that
the 6 mm nut (lock nut) is securely
tightened.
Adjustment of the squareness of the saw blade with
relation to the table can also be accomplished by
adjusting the stopper bolts as described above.
6 mm
Lock nut
6 mm
Bolt (A)
(stopper for 0 )
Fig. 10
6 mm Bolt (B)
(stopper for left
45 bevel angle)
6 mm
Lock nut
Handle
table
support
Fig. 11
10. PACKING
The main body of the Model C 10FC2 is sandwiched between packing (A) and packing (B) made of styrofoam.
This system makes the packaging work easier.
(1) Preparation
Remove the vise ass'y, and remove the dust bag from the main unit. Remove the truss hd. screw (1/4" x 1/2")
which fixes the link to the angle regulator and set the link free. Mount the truss hd. screw (1/4" x 1/2") to the
angle regulator again. Then swivel the table through 60 toward the right. Fix the angle regulator securely
with the handle table support. Position the handle table support vertically to keep it from contact with packing
(A) when putting the main unit on packing (A). Push down the head section and move the lock plate to the
lock position to secure the head section in the lower position.
(2) How to install packing (A)
Put packing (A) in the carton box.
Put the main unit in packing (A).
(3) How to install packing (B)
Put packing (B) on the main unit. Put the vise ass'y and the dust bag in the carton box on top of packing (B).
Close the lids of the carton box and bind them together.










