Operating Guide
•  Connect valve body to water supplies using 
the proper fittings for your valve body type 
(copper tubing, iron pipe or Pex). Note: (1) 
is the cold inlet port and (2) is the hot 
inlet port.
•  If either of the two outlet ports is to be 
unused, seal the port with a pipe plug.
•  Remove bonnet (1). 
  NOTICE: Avoid soldering at high 
temperatures. Components of the rough 
could become damaged.
•  Be sure stops (2) are removed from the 
w/stops version before soldering. Do not 
install stops before soldering.
If you are making a BACK TO BACK 
OR REVERSE INSTALLATION (hot 
on right and cold on left) install the valve 
body as described, but the water supply 
lines will be reversed. Note: (1) is the 
hot inlet port and (2) is the cold inlet 
port.
Copper Tubing  Iron Pipe
Pex
C.
1
2
1
2
1
2
MultiChoice
®
 Rough-In Installation
D.
1
2
472264 Rev. H










