Installation Guide
Connect top outlet (1) to shower pipe with 
proper fittings. Connect bottom outlet (2) to tub 
spout pipe with proper fittings. Pipe (3) between 
valve body and tub spout must be a minimum of 
1/2" (13 mm) copper pipe or 1/2" (13 mm) iron 
pipe in a straight drop no less than 8" (203 mm) 
but no more than 18" (457 mm) long with only 
one iron pipe or copper 90 degree elbow to the 
tub spout nipple. Do not use PEX tubing for 
tub spout drop.
Prior to testing, remove cover (1) and bonnet 
nut (2). Insert cartridge and tighten bonnet nut. 
Turn cartridge stem counter clockwise until it will 
no longer rotate. Plug both outlets with proper 
fittings. Check for leaks. After testing, remove 
cartridge, shower and/or tub spout plug and 
flush system by slowly turning on water supply 
to purge valve system of debris. After flushing, 
reinstall cartridge (see page 6), bonnet nut 
and cover. Install stops (3 & 4) in the models 
with stops and set to full open. Note: Install 
stops as follows: Thread nut (3) onto stem 
(4) as shown. Then press stem and nut 
assembly into body and tighten using a 3/8", 
6 point, deep well socket. With a flat head 
screwdriver, adjust stem clockwise to close 
and counterclockwise to open.
E.
F.
MultiChoice
®
 Rough-In Installation
1
2
3
PRESSURE TESTING & FLUSHING THE INSTALLATION 
1
2
1
2
4
3
3
4
5










