Installation manual

8 Operation and installation manual SOLIVIA Gateway M1 G2
7 Installation Procedure
7.1 Registration
First register for a SOLIVIA Monitor user account on the web at: http://monitoring.solar-
inverter.com. After registering you will receive a conrmation email including a link to
activate your user account. After the activation of your user account go to
http://monitoring.solar-inverter.com and login to setup your PV installation at the moni-
toring portal (only the plant and the gateway are needed, the inverter will be created
automatically). Complete the PV installation setup before installing the monitoring hard-
ware. In this way, you can go to the web portal after the hardware installation and verify
everything is working correctly.
NOTICE
At the install site, verify the internet connection is active by connecting a laptop to the
internet connected network point and pointing a web browser to www.solar-inverter.
com.
7.2 Mounting
Mount the SOLIVIA gateway with the appropriate AC power location specied in Chap-
ter 5.2. You have either the possibility to mount the SOLIVIA gateway on a DIN rail or
directly to the wall.
7.2.1 Mounting on a DIN Rail
The gateway can be mounted on the following DIN Rails:
DIN Rail according to EN60715 TH35-15
DIN Rail according to EN60715 TH35-7.5
The gateway should be installed horizontally with connectors on the bottom.
To mount, snap the gateway on the DIN rail as shown in Figure 1:
1. Pull the gateway's DIN rail latch OUT.
2. Tilt the unit slightly upwards, hook the top end onto the DIN rail and push down-
wards until stopped.
3. Position the bottom front end against the DIN rail until it has snapped onto the DIN
rail.
4. Push the gateway's DIN rail latch IN to lock.
2
1
2
3
4
Figure 1: Mounting the gateway on a DIN rail