Installation manual

EN
3Operation and installation manual SOLIVIA Gateway M1 G2
Table of Contents
1 About this Manual 4
1.1 Purpose of this Manual 4
1.2 Warnings and Symbols 4
2 Intended Use 5
3 General Safety Instructions 5
4 Scope of Delivery 6
5 Planning 6
5.1 Items / Tools Required for Installation 6
5.2 Further Requirements 6
6 Connector Positions 7
7 Installation Procedure 8
7.1 Registration 8
7.2 Mounting 8
7.2.1 Mounting on a DIN Rail 8
7.2.2 Mounting Directly to the Wall 9
7.3 RS485 Connection 9
7.4 Ethernet Connection 9
7.5 Connection of the Ripple Control Receivers 9
7.6 Power Connection 11
7.7 Installation Feedback 11
8 LED Status 12
9 Troubleshooting RS485 / Ethernet Communication 12
10 Configuration through Web Server 12
10.1 Access the Configuration Web Server 13
10.2 First Log in 14
10.3 Network Settings 14
10.4 Connection Settings 15
10.4.1 RS485 Bus Communication 16
10.4.1.1 Wireless RS485 Modem 16
10.4.2 Delta Database Connection 16
10.4.3 Force RS485 Bus Scan 16
10.4.3.1 List of Connected SOLIVIA Solar Inverters 16
10.4.4 Force Gateway Reset 17
10.4.5 Restart Gateway 17
10.5 Digital Inputs 17
10.5.1 Power Management 18
10.5.2 Power Factor Control 18
10.6 Power Balancing 19
10.6.1 Configuration 19
10.6.1.1 Feature Activation 20
10.6.1.2 Power Balancing Requested from the Public Grid Supplier 20
10.6.1.3 Grid Assignment 20
10.6.2 Balancing 21
10.7 Inverter Information 21
11 Delta Service Software 22
12 Reset Button 22
13 Product Specification 23
14 Certificates 24