Installation manual
20 Operation and installation manual SOLIVIA Gateway M1 G2
10.6.1.1 Feature Activation
By default the feature is off. For countries without restrictions nothing has to be done.
10.6.1.2 Power Balancing Requested from the Public Grid Supplier
The default value is 4.6 kVA due to the German regulation. This value can be changed
to other values without restriction.
10.6.1.3 Grid Assignment
For each inverter found during the bus scan, you can choose to which line (L1, L2 or
L3) the device is connected.
NOTICE
Please note that the gateway web server will show you a warning if the sum of the
nominal powers on the three phases differs by more than the maximum unbalanced
load. Even with this warning the balancing works. However this warning is a strong
indication that the mapping of the inverters to the public grid phases should be
reviewed carefully!
There is no possibility to check the right mapping of the inverters to
the phase except the electrician veries the cabling of each inverter.
Thus the installer should be reminded to put attention to this issue.