Installation manual

EN
11Operation and installation manual SOLIVIA Gateway M1 G2
7.6 Power Connection
Connect the power source to the SOLIVIA gateway (Step 3 in gure 4) and check the
SOLIVIA gateway LED. If the setup is correct, the Status LED will be solid green for
approx. 5 seconds. For further information, please refer to Chapter 8.
Verify that your setup is successful by going to the SOLIVIA Monitor web portal at:
http://monitoring.solar-inverter.com and log in to view your PV system.
Internet
RS485
RESET RS485
EXT. CONTROL
1 2 3 4 5 6 7 8 A B
LAN INPUT
5V
GW
STATUS
2
3
1
Figure 4: Connection diagram
WARNING
Risk of death or heavy injury due to dangerous voltage
Repairs on defective cables should be done by qualied electri-
cians only!
Only recommended and / or commercially available cables
should be used.
7.7 Installation Feedback
NOTICE
This function works only for SOLIVIA solar inverters of the 4th generation!