Installation manual
10 Operation and installation manual SOLIVIA Gateway M1 G2
The ripple control receiver that controls the power management (power limitation) has
to be connected to the inputs 1 to 4. The receiver that controls the power factor (cos
phi) has to be connected to the inputs 5 to 8.
After connection of the ripple control receiver(s) the gateway has to be congured in
order to do the required control of the SOLIVIA solar inverters. For further information,
please refer to Chapters 10.5 and 10.6.
Of course it is also possible to connect only one ripple control receiver, i. e. the one that
controls the power management.
Figure 3: Ripple control receivers circuit diagram
NOTICE
The cables connecting the SOLIVIA gateway with the ripple control receiver(s) should
meet the following specications:
• Max. conductor cross-section: 0.5 mm
2
(AWG20)
• Min. conductor cross-section: 0.14 mm
2
(AWG26)
• Tightening torque: 0.12 – 0.15 Nm
• Max. cable length: 2 m