Installation manual
8. Commissioning
Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
38
8.4 Commissioning for VDE AR N 4105 Grids
The commissioning for VDE AR N 4105 grids is valid for the following countries and grids.
Country Grid Notes
Denmark
DK LVD
Germany
DE LVD
1. Check all connections and cables for damage and correct
seating. Correct the installation if necessary.
DC DISCONNECT
OFF
ON
2. Switch on the DC isolating switch.
→ The startup process of the solar inverter will begin.
After the startup process and the automatic self-test,
the commissioning procedure of the inverter starts
and the Installation menu is displayed.
➔
continue
Language: English
-------------------
Installation
3. To change the language, press the button and then
set the language using the
buttons. Press the
button to apply the language.
Available languages:
Czech | Danish | Dutch | English |
French | German | Italian | Polish |
Portuguese | Romanian | Slovak |
Slovenian | Spanish
➔
-------------------
continue
Language: English
-------------------
Installation
4. Press the buttons to select continue and then
press the
button.
→ This displays the Load USB Data menu.
➔
-------------------
No
Yes
-------------------
Load USB data
5. Press the buttons to select No and then press the
button.
→ The Grid Selection menu is displayed.
➔
continue
Grid: DE LVD
-------------------
Grid selection
6. To change the grid, press the button and then set
the grid using the
buttons. Press the button to
apply the grid.
NOTE: Here you can select the proper
grid for your country.
➔
weiter
Netz: DE LVD
-------------------
-------------------
Netzauswahl
7. Press the buttons to select continue and then
press the
button.
→ The PDD Settings (settings for grid and system
protection) will be displayed.
➔
continue
PDD: Standard
-------------------
PDD settings
8. To change the settings for the grid and system protection,
press the
button and then set the option using the
buttons. Press the button to apply the setting.
Available options:
Standard: Loads the settings dened
by the VDE AR N 4105 standard.
Off: Grid and system protection is
deactivated.
User: The parameters can be
manually congured within the limits
dened by the VDE AR N 4105 stan-
dard.