User manual
Page 4
Unpacking
The Strebel S CB includes the following documents and accessories:
Installation instructions for the installer.
User instruction (incorporated).
1 suspension bracket.
Fuses and 3 nuts for mounting the burner plate (attached to the front of the gas valve).
1 siphon with tightening nut and gasket.
Reducing couplings (where required) for flue gas discharge and air supply.
THE BOILER IS SET FOR NATURAL GAS G20. On delivery, unpack and immediately check that the Strebel S-CB is complete
and without any defects. Report any damage immediately to the supplier or Strebel Ltd. Re pack the Boiler until fitted.
Beware the Boiler is Heavy see table on page 7. To avoid injury consider the weight of the appliance.
1. After removing the carton, the easiest way to take the boiler off the pallet is as follows:
2. Lift the pallet including the boiler (at the side of the flue outlet) to a vertical position.
3. The boiler has a polystyrene block, which now supports the Boiler on the floor.
4. Push the Boiler a little forward, until the pallet is not touching the floor anymore.
5. The boiler stands now on the flow- and return pipes and the polystyrene block.
6. Take away the pallet.
The boiler can now be lifted (the Boiler is Heavy see table on page 7 to avoid injury consider the weight of the appliance) for
mounting. You must unclip and remove the Boiler door before lifting.
Select the position for the Boiler
Select a position in the building with adequate access to the front, side and the bottom of the boiler (for future maintenance
and servicing) mounting on a non combustible surface. On every side of the boiler at least 50 mm of clearance should
be applied to walls or wall units, 350 mm above the top side of the boiler and 250 mm from the bottom of the
boiler.
ALWAYS CONSIDER YOUR SAFETY.
1
2
3
4 5 6