Deployment Guide

a) Connect a SAS cable from storage controller 1: port 1 to the first expansion enclosure in the chain, left EMM, port 1.
b) Connect a SAS cable from storage controller 2: port 2 to the last expansion enclosure in the chain, left EMM, port 3.
Figure 57. Connect the A-Side Cables to the Expansion Enclosures
1.
Storage system 2. Storage controller 1
3. Storage controller 2 4. Expansion enclosure 1
5. Expansion enclosure 2
2. Label the back-end cables.
Add an SCv360 Expansion Enclosure to the B-Side of the
Chain
Connect the expansion enclosure to one side of the chain at a time to maintain drive availability.
Steps
1. Disconnect the B-side cable (shown in blue) from the expansion enclosure: right EMM, port 3. The A-side cables continue to carry I/O
while the B-side is disconnected.
82
Adding or Removing Expansion Enclosures