Deployment Guide
SCv2000/SCv2020 and Two or More SC100/SC120 Expansion Enclosures
This figure shows an SCv2000/SCv2020 storage system cabled to two SC100/SC120 expansion enclosures.
Figure 63. SCv2000/SCv2020 and Two SC100/SC120 Expansion Enclosures
1.
Storage system 2. Storage controller 1
3. Storage controller 2 4. Expansion enclosure 1
5. Expansion enclosure 2
The following table describes the back-end SAS connections from an SCv2000/SCv2020 to two SC100/SC120 expansion
enclosures.
Table 5. SCv2000/SCv2020 Connected to Two SC100/SC120 Expansion Enclosures
Path Connections
Chain 1: A Side (Orange)
1. Storage controller 1: port A to expansion enclosure 1: top EMM, port A.
2. Expansion enclosure 1: top EMM, port B to expansion enclosure 2: top EMM, port A.
3. Expansion enclosure 2: top EMM, port B to storage controller 2: port B.
Chain 1: B Side (Blue)
1. Storage controller 2: port A to expansion enclosure 1: bottom EMM, port A.
2. Expansion enclosure 1: bottom EMM, port B to expansion enclosure 2: bottom EMM, port A.
3. Expansion enclosure 2: bottom EMM, port B to storage controller 1: port B.
Label the Back-End Cables
Label the back-end cables that interconnect the storage controllers or label the back-end cables that connect the storage system
to the expansion enclosures.
Prerequisites
Locate the cable labels provided with the expansion enclosures.
About this task
Apply cable labels to both ends of each SAS cable to indicate the chain number and side (A or B).
Steps
1. Starting with the top edge of the label, attach the label to the cable near the connector.
66