Setup Guide
Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount configuration, follow these steps.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange with two user-supplied screws. See item 1 in the following figure.
2. Slide the back bracket towards the post and secure it to the post flange with two user-supplied
screws. See item 2 of the following figure.
3. Repeat this procedure for the second rail.
Install the Hardware
7