Setup Guide

Figure 6. Installing the Z9100–ON in a Front-Rack Configuration
Attaching the Ground Cable (Recommended)
Depending on the type of Z9100–ON system you have, to attach a ground cable to the chassis, you will
need one of the included M3 or M4 screws.
The system ships with one of the following two configurations:
One threaded hole using an included M3 screw.
Two threaded holes using one of the two included M4 screws.
In both configurations, the ground cable is not included. To properly ground the chassis, Dell Networking
recommends a 6 AWG one- or two-hole lug, M3 or M4 hole size. The system hole lugs must be a UL-
recognized, crimp-type lug.
CAUTION: Grounding conductors must be made of copper. Do not use aluminum conductors.
NOTE: Coat the one-hole lug with an anti-oxidant compound prior to crimping. Bring any unplated
mating surfaces to a shiny finish, and coat with an anti-oxidant prior to mating. Plated mating
surfaces must be clean and free from contamination.
NOTE: The rack installation ears are not a suitable grounding point.
Install the Hardware
11