Setup Guide

Figure 5. Attaching the Switch Rails
2. After you have installed both switch rails, line them up on the previously mounted ReadyRails and
slide the switch in until it is flush with front of rack. About 3 inches before you fully insert your
system, the rail locking feature engages to keep the switch from inadvertently sliding out of the rack
and falling.
NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace.
10
Install the Hardware