Setup Guide

1U Tool-less Configuration
To install the Dell ReadyRails system using the 1U tool-less configuration, follow
these steps.
1 With the ReadyRails flange ears facing outward, place one rail between the left
and right vertical posts. Align and seat the back flange rail pegs in the back
vertical post flange. To see how the pegs appear in both the square and
unthreaded round holes, see item 1 in the following figure.
2 Align and seat the front flange pegs in the holes on the front side of the
vertical post.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each flange ear and
unseat each rail.
Figure 4. 1U Tool-less Configuration
Two-Post Flush-Mount Configuration
To install the Dell ReadyRails system using the two-post flush-mount configuration,
follow these steps.
1 For this configuration, remove the castings from the front side of each
ReadyRails assembly. See item 1 in the following figure. Use a Torx driver to
Install the Hardware 9