Setup Guide

3 Attach the assembly to the S6010-ON chassis:
a Apply the thread-locker compound to the two pan head screws.
b Attach the GND lug and bracket assembly to the two-hole chassis
ground connector nuts on the S6010-ON PSU side, tightening the
screws to ensure torque between 3–5 inch/lbs.
Figure 3. Attaching Assembly to S6010-ON PSU Side
CAUTION: Take care not to damage the attached ground wire as you proceed
to install the switch.
After the switch is installed in the rack, see Completing the Ground Wire Installation.
Installing the Dell ReadyRails System
The ReadyRails rack mounting system is provided to easily configure your rack so
that you can install your switch.
The Dell ReadyRails™ system is provided for 1U front-rack and two-post
installations. The ReadyRails system includes two separately packaged rail
assemblies and two rails that are shipped attached to the sides of the switch. Install
the ReadyRails system using the 1U tool-less method or one of three possible 1U
tooled methods (two-post flush mount, two-post center mount, or four-post
threaded).
CAUTION: Do not use the mounted ReadyRails as a shelf or a workplace.
NOTE: The illustrations in this document are not intended to represent a specific
switch.
Install the Hardware 8