Setup Guide
Install the Hardware
This information describes installation of the S6010-Open Networking (ON) system.
Dell Networking recommends completing the installation procedures in the order
presented here.
Topics:
• Operation and Safety Considerations
• Installing the Ground Lug and Bracket Assembly
• Installing the Dell ReadyRails System
• Install the System
• Completing the Ground Wire Installation
• Installing AC or DC Power Supplies
• Installing a Fan Module
• Installing the SFP+ and QSFP+ Optics
• Supply Power and Power Up the System
• After Installing the S6010–ON
Operation and Safety Considerations
Before installing the switch, review these operation and safety guidelines.
Review these guidelines for switch installation:
• You have enough clearance to the front of the switch so you can read the light
emitting diodes (LEDs).
• The AC power cord reaches from the power outlet to the power supply unit
(PSU) side connector.
• The switch is rack-mounted before you power it up.
• Cabling is away from sources of electrical noise, such as radios, power lines, and
fluorescent lighting. Ensure that the cabling is safely away from other devices
that might damage the cables. If needed, allow one rack unit (RU) space
between devices to provide room for cabling.
• Airflow around the switch and through the vents is unrestricted.