Setup Guide

3 Front standoff with locking
tab.
2 After you have installed both switch rails, line them up on the previously
mounted Ready-Rails and slide the switch in ( item 1 in the following figure)
until it is flush with front of rack. About 3 inches before you fully insert your
system, the rail locking feature (items 2 and 3) engages to keep the switch
from inadvertently sliding out of the rack and falling.
Figure 9. Installing the S6010–ON in a Front-Rack Configuration
1 Chassis. 2 Rail end.
3 Rail locking feature.
Install the Hardware 15