Setup Guide
Install the System
You can mount the system in the 1U front-rack or 1U two-post (flush and center)
configurations. For the 1U two-post (flush and center) configurations, slide the
system into the rails in the same manner as the four-post configurations.
The following is an example of a 1U front-rack configuration.
Installing a 1U Front-Rack
You must configure the rails that are attached to the system.
1 Attach the switch rails (inner chassis members) to the S6010–ON system
( items 1 and 2 in the following figure). Item 3 shows the detail for the front
standoff with the locking tab.
Figure 8. Attaching the Switch Rails
1 Locking feature. 2 Chassis.
Install the Hardware 14










