Setup Guide

remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain the castings for future rack requirements.
It is not necessary to remove the rear flange castings.
2 Attach one rail to the front post flange with two user-supplied screws. See
item 2 in the following figure.
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. See item 3
in the following figure.
4 Repeat this procedure for the second rail.
Figure 5. Two-Post Flush-Mount Configuration
Install the Hardware 10