Install Guide
Figure 16. Ground wire and GND lug
1
1–ground wire 2 2–GND lug
3 Install the second GND lug in compliance with NEC guidelines at the desired location on your rack to ground the switch.
a Ensure that the rack mating surface is clean.
b Bring any bare metal to a bright nish.
c Apply the anti-oxidant compound to the mating surfaces before mating.
SFP+ and QSFP+ optic installation
S6010–ON ports include 32 ports that function either as 40 GbE, or, using breakout cables, as a conguration of 96 ports of 10 GbE SFP+.
The 32 ports also include eight, ports 13–20, that are 40 GbE QSFP+.
For a list of supported optics, see the S6010-ON Specication Sheet at www.dell.com/support/ or contact your Dell representative.
CAUTION
: ESD damage can occur if the components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S6010-ON and its components.
WARNING: When working with optical bers, follow all the warning labels and always wear eye protection. Never look directly
into the end of a terminated or unterminated ber or connector as it may cause eye damage.
1
Position the optic in the correct position. The optic key prevents it from being inserted incorrectly.
2 Insert the optic into the port until it gently snaps into place.
NOTE
: The top row of QSFP+ ports requires that you install the 40 GbE optics with the tabs facing up. The bottom row
of QSFP+ ports requires that you install the 40 GbE optics with the tabs facing down.
NOTE: When you cable the ports, do not interfere with the airow from the small vent holes preceding and below the
ports.
26 S6010–ON installation










