Install Guide

Figure 13. Four-post threaded conguration
1U two-post installation
You can install the switch in a 1U ush or center two-post congurations. Slide the system into the rails in the same manner as the four-
post congurations.
1U front-rack installation
Congure the rails that are attached to the system.
1 Attach the switch inner chassis member rails to the system, items 1 and 2.
Item 3 shows the front stando with the locking tab.
S6010–ON installation
23