Install Guide
Figure 12. Two-post center-mount conguration
Four-post threaded conguration
CAUTION
: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
1 Remove the latch castings from each end of the ReadyRails assemblies.
Use a Torx driver to remove the two screws from each latch casting and remove each casting, item 1. Retain the castings for future
rack requirements.
2 For each rail, attach the front and back anges to the post anges with two user-supplied screws at each end, item 2.
22
S6010–ON installation










