Install Guide

Align and seat the back ange rail pegs in the back vertical post ange. To see how the pegs appear in both the square and
unthreaded round holes, see item 1.
2 Align and seat the front ange pegs in the holes on the front side of the vertical post.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each ange ear and unseat each rail.
Figure 10. 1U tool-less conguration
Two-post ush-mount conguration
CAUTION
: Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1 For this conguration, remove the castings from the front side of each ReadyRails assembly, item 1.
Use a Torx driver to remove the two screws from each front ange ear and remove each casting. Retain the castings for future rack
requirements. Removal of the back ange castings is not necessary.
2 Attach one rail to the front post ange with two user-supplied screws, item 2.
3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post ange with two user-supplied
screws, item 3.
4 Repeat this procedure for the second rail.
20
S6010–ON installation