Deployment Guide
Table Of Contents
- 1 Introduction
- 2 Hardware overview
- 3 Topology options
- 4 VxRail in the data center
- 5 Configuration planning
- 6 Switch configuration prerequisites
- 7 Configure switches
- 8 Switch validation
- 9 Deploy VxRail
- 10 Use of VxRail 4.7.0 to validate Dell EMC Networking S5200F-ON
- A Validated components for S5148F-ON using VxRail 4.5
- B Validated components for S5248F-ON and S5232F-ON using VxRail 4.7.0
- C VxRail network adapter traffic optimization
- D Configure breakouts on port groups and interfaces
- E Technical resources
- F Support and feedback
2 Dell EMC Networking OS10 Enterprise Edition Switch Configuration Guide for VxRail featuring S5248F-ON,
S5232F-ON and S5148F-ON
Revisions
Date
Description
November 2018
Added switch validation details for S5248F-ON and S5232F-ON with VxRail 4.7.0, port
group and interface breakout information for S5248F-ON and S5232F-ON.
September 2018
Initial release
The information in this publication is provided “as is.” Dell Inc. makes no representations or warranties of any kind with respect to the information in this
publication, and specifically disclaims implied warranties of merchantability or fitness for a particular purpose.
Use, copying, and distribution of any software described in this publication requires an applicable software license.
© 2018 Dell Inc. or its subsidiaries. All Rights Reserved. Dell, EMC, Dell EMC and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other
trademarks may be trademarks of their respective owners.
Dell believes the information in this document is accurate as of its publication date. The information is subject to change without notice.