Users Guide

Validated components
41 Dell EMC Networking OS9 Switch Configuration Guide for VxRail 4.5
A Validated components
The following tables include the hardware, software, and firmware used to configure and validate the
examples in this guide.
A.1 Dell EMC Networking Switches
Switches and OS versions
Qty
Item
OS Version
2
Dell EMC Networking S5048F-ON leaf switches
9.12.1.0
1
Dell EMC Networking S3048-ON management switch
9.13.0.3
A.2 VxRail P570 nodes
A cluster of four VxRail P570 nodes was used to validate the examples in this guide. The nodes were each
configured as shown in the table below.
VxRail P570 node components
Qty per
node
Item Firmware version
2
Intel Xeon Gold 6136 CPU @ 3.00GHz, 12 cores
12
16GB DDR4 DIMMs (192GB total)
3
800GB SAS SSD
10
1.2TB SAS HDD
1
Dell HBA330 Storage Controller
13.17.03.05
1
Boot Optimized Storage Solution (BOSS) Controller w/ 2x240GB
SATA SSDs
2.5.13.2008
1
Broadcom 57414 rNDC 2x25GbE SFP28 ports
20.06.05.11
-
BIOS
1.2.11
-
iDRAC with Lifecycle Controller
3.15.17.15