Deployment Guide
Table Of Contents
- Getting Started Guide
- Introduction
- Hardware Overview
- Installation
- Installing the Rack or Cabinet
- Attaching the Mounting Brackets
- Rack Mounting Safety Considerations
- Installing the S5000 Chassis into a 4-Post Rack or Cabinet
- Rack Grounding
- Important Points to Remember for Installing an Ethernet Module
- Installing an Ethernet Module
- Important Points to Remember for Installing a Unified Port Module
- Installing a Unified Port Module
- Important Points to Remember for Installing an AC Power Supply
- Installing an AC Power Supply
- Assembling and Connecting the Safety Ground Wire for DC Power Supply
- Important Points to Remember for Installing a DC Power Supply
- Installing a DC Power Supply
- Installing the Ferrite Bead for DC Power and Return Cables
- Securing Power Cables
- Important Points to Remember for Installing a Fan Module
- Installing a Fan Module
- Installing the SFP+ and QSFP+ Optics
- Splitting QSFP+ Ports to SFP+ Ports
- Supplying Power and Powering Up the System
- Performing the Initial Configuration
- Software Configuration Overview
- Accessing the RJ-45/RS-232 Console Port
- Accessing the RJ-45 Console Port with a DB-9 Adapter
- Accessing the USB-B Console Port
- Enter the Initial Configuration Information
- Configuring the Enable Password
- Configuring a Host Name
- Navigate CLI modes
- Default Configuration
- Configuring Layer 2 (Data Link) Mode
- Accessing the System Remotely
- Configuring the Management Port IP Address
- Configuring a Management Route
- Configuring a Username and Password
- Creating a Port-based VLAN
- Assigning Interfaces to a VLAN
- Assigning an IP Address to a VLAN
- Connecting the S5000 to the Network
- Technical Specifications

Figure 20. Installing the Ferrite Bead for DC Power and Return Cables
1. Ferrite Bead 2. DC Power and Return Cables
3. Leave approximately 4 to 5 inches of the DC power and return cables end protruding from the
ferrite.
4. Snap the ferrite bead shut.
Securing Power Cables
1. Bend the system power cables, as shown in the following illustration, and attach to the cable clasp.
Figure 21. Securing Power Cables
2. Plug the other end of the power cables into a grounded electrical outlet or a separate power source
such as an uninterruptible power supply (UPS) or a power distribution unit (PDU).
28










