Deployment Guide
Table Of Contents
- Getting Started Guide
- Introduction
- Hardware Overview
- Installation
- Installing the Rack or Cabinet
- Attaching the Mounting Brackets
- Rack Mounting Safety Considerations
- Installing the S5000 Chassis into a 4-Post Rack or Cabinet
- Rack Grounding
- Important Points to Remember for Installing an Ethernet Module
- Installing an Ethernet Module
- Important Points to Remember for Installing a Unified Port Module
- Installing a Unified Port Module
- Important Points to Remember for Installing an AC Power Supply
- Installing an AC Power Supply
- Assembling and Connecting the Safety Ground Wire for DC Power Supply
- Important Points to Remember for Installing a DC Power Supply
- Installing a DC Power Supply
- Installing the Ferrite Bead for DC Power and Return Cables
- Securing Power Cables
- Important Points to Remember for Installing a Fan Module
- Installing a Fan Module
- Installing the SFP+ and QSFP+ Optics
- Splitting QSFP+ Ports to SFP+ Ports
- Supplying Power and Powering Up the System
- Performing the Initial Configuration
- Software Configuration Overview
- Accessing the RJ-45/RS-232 Console Port
- Accessing the RJ-45 Console Port with a DB-9 Adapter
- Accessing the USB-B Console Port
- Enter the Initial Configuration Information
- Configuring the Enable Password
- Configuring a Host Name
- Navigate CLI modes
- Default Configuration
- Configuring Layer 2 (Data Link) Mode
- Accessing the System Remotely
- Configuring the Management Port IP Address
- Configuring a Management Route
- Configuring a Username and Password
- Creating a Port-based VLAN
- Assigning Interfaces to a VLAN
- Assigning an IP Address to a VLAN
- Connecting the S5000 to the Network
- Technical Specifications

4
Installation
Before installing the switch, verify that you meet these guidelines:
• Enough clearance to the front of the switch so you can read the LEDs.
• AC/DC power cord reaches from the power outlet to the Utility-panel connector.
• Switch is rack-mounted before you install the power supply modules.
• Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting.
Make sure that the cabling is safely away from other devices that might damage the cables. If needed,
allow one RU space between devices to provide room for cabling.
• Airflow around the switch and through the vents is unrestricted.
• Temperature around the unit does not exceed 104°F (40°C). If the switch is in a closed or multirack
assembly, the temperature might be higher than normal room temperature.
• Humidity around the switch does not exceed 85 percent.
• Altitude at the installation site is below 6600 feet.
• Switch is installed in an environment as free as possible from dust and foreign conductive material
(such as metal flakes from construction activities). Cooling mechanisms, such as fans and blowers in
the switch, can draw dust and other particles causing contaminant buildup inside the chassis, which
can result in system malfunction.
Installing the Rack or Cabinet
To install the S5000 system, Dell Networking recommends completing the
installation procedures in the order presented here.
NOTE: Always handle the system and its components with care. Avoid dropping the S5000 chassis
or its field replaceable units.
NOTE: For proper ventilation, position the S5000 chassis in an equipment rack (or cabinet) with a
minimum of 5 inches (12.7 cm) of clearance around exhaust vents. The acceptable ambient
temperature ranges are listed in the Environmental Parameters section.
CAUTION: Always wear an ESD-preventive wrist or heel ground strap when handling the S5000
and its components. As with all electrical devices of this type, take all necessary safety
precautions to prevent injury when installing this system. ESD damage can occur if components
are mishandled.
14










