Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4810–ON Installation Guide August 2020
- About this Guide
- The S4810–ON System
- Site preparations
- Install the S4810–ON
- Power supplies
- Fans
- Console Ports
- Specifications
- Chassis Physical Design
- Agency Compliance
- USA Federal Communications Commission (FCC) Statement
- European Union EMC Directive Conformance Statement
- Japan: VCCI Compliance for Class A Equipment
- Korean Certification of Compliance
- Safety Standards and Compliance Agency Certifications
- Electromagnetic Compatibility (EMC)
- Product Recycling and Disposal
- Removing the SD card
- Replacing the battery
- Technical support

Figure 4. Attaching Mounting Brackets into a Two-Post Rack or Cabinet
1.
View from the chassis I/O side 2. Connect to the Rack or Cabinet (ears)
3. Screws 4. Screws
5. Connect to the Rack or Cabinet (ears) 6. Power Supply
Two-post installation
Ensure that there is adequate clearance surrounding the rack or within the cabinet to permit access and airflow.
To install a system into a two-post 19-inch equipment rack using the already attached mounting brackets, follow these steps.
NOTE:
Dell Technologies recommends using one person to hold the S4810–ON chassis in place while another person
attaches the brackets to the posts.
Attach the bracket “ears” to the rack or cabinet posts using the two screws for each bracket. Ensure that the screws are tightened firmly.
14
Install the S4810–ON










