Setup Guide
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report
any evidence of damage.
When unpacking the S4200-ON Series switch, make sure that the following items are
included:
• One S4200-ON Series (S4248FB-ON or S4248FBL-ON) switch
• One RJ-45 to DB-9 female cable
• Two sets of rail kits, no tools required
• Two PSUs
• Five fan units
• Two country- and region-specic AC power cords
• S4200-ON Series Set-up Guide
• Safety and Regulatory Information
• Warranty and Support Information
1 Place the container on a clean, at surface and cut all straps securing the container.
2 Open the container or remove the container top.
3 Carefully remove the switch from the container and place it on a secure and clean
surface.
4 Remove all packing material.
5 Inspect the product and accessories for damage.
Rack or cabinet installation
You may either place the switch on a rack shelf or mount the switch directly into a 19" wide,
EIA-310- E-compliant rack. Rack mounting includes four-post, two-post, round threaded
holes, or square holes. The ReadyRails system is provided for 1U front-rack and two-post
installations.
The ReadyRails system includes two separately packaged rail assemblies. To begin
installation, separate each rail assembly by sliding the inside rail out of the outside rail.
WARNING
: This guide is a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory
information booklet before you begin.
12 S4200-ON Series Installation