Setup Guide

S4200-ON Series Installation
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON), complete the installation
procedures in the order presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet installation
ReadyRails installation
1U Tool-less mount installation
Two-post ush-mount installation
Two-post center-mount installation
Four-post threaded installation
S4200-ON Series switch installation
1U front-rack installation
Optics installation
Switch power-up
After switch installation
3
S4200-ON Series Installation 11