Setup Guide
S4200-ON Series Installation
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON), complete the installation
procedures in the order presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any
eld replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
• Unpack
• Rack or cabinet installation
• ReadyRails installation
• 1U Tool-less mount installation
• Two-post ush-mount installation
• Two-post center-mount installation
• Four-post threaded installation
• S4200-ON Series switch installation
• 1U front-rack installation
• Optics installation
• Switch power-up
• After switch installation
3
S4200-ON Series Installation 11