Setup Guide

S4200-ON Series Installation
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON), complete the installation procedures in the order presented
in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet installation
ReadyRails installation
1U Tool-less mount installation
Two-post flush-mount installation
Two-post center-mount installation
Four-post threaded installation
S4200-ON Series switch installation
1U front-rack installation
Optics installation
Switch power-up
After switch installation
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4200-ON Series switch, make sure that the following items are included:
One S4200-ON Series (S4248FB-ON or S4248FBL-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Five fan units
Two country- and region-specific AC power cords
S4200-ON Series Set-up Guide
Safety and Regulatory Information
Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
3
8 S4200-ON Series Installation