Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4200-ON Series Set-up Guide
- About this guide
- Site preparations
- S4200-ON Series Installation
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4200-ON Series switch installation
- 1U front-rack installation
- Optics installation
- Switch power-up
- After switch installation
- Specifications
- Support
Figure 5. Two-post center-mount installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3. Repeat this procedure for the second rail.
Four-post threaded installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.