Setup Guide
Table Of Contents
- Dell EMC PowerSwitch S4200-ON Series Set-up Guide
- About this guide
- Site preparations
- S4200-ON Series Installation
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4200-ON Series switch installation
- 1U front-rack installation
- Optics installation
- Switch power-up
- After switch installation
- Specifications
- Support
Figure 2. Separate rails
1U Tool-less mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
10
S4200-ON Series Installation