Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support

Figure 8. Front rack installation
NOTE
: Do not the use the mounted Ready-Rails as a shelf or a workplace.
3 Tighten the two thumb screws and rack screws.
To remove the chassis from the rack or cabinet, press in the two side-release bars on the chassis at the same time and slide the chassis
forward.
Optics installation
For a list of supported optics, see the S4100–ON Series data sheet at www.dell.com/support or contact your Dell representative.
CAUTION
: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S4100–ON Series and its components.
WARNING: When working with optical bers, follow all warning labels and always wear eye protection. Never look directly into
the end of a terminated or unterminated ber or connector as it may cause eye damage.
1
Position the optic so it is in the correct position.
The optic has a key that prevents it from being inserted incorrectly.
2 Insert the optic into the port until it gently snaps into place.
NOTE
: When you cable the ports, be sure not to interfere with the airow from the small vent holes above and below
the ports.
S4100–ON Series installation 17