Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support

Figure 7. Switch rail attachment
2 After you install both rails, line them up on the ReadyRails. Slide the switch in until it is ush with the front of rack.
About three inches before you fully insert your system, the rail locking feature engages to keep the switch from inadvertently sliding
out and falling.
16
S4100–ON Series installation