Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support

Figure 5. Two-post center-mount installation
2 Slide the back bracket towards the post. Secure it to the post ange with two user-supplied screws, items 2 and 3.
3 Repeat this procedure for the second rail.
Four-post threaded installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
1 Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver.
Retain the latch castings for future rack requirements.
14
S4100–ON Series installation