Setup Guide
Table Of Contents
- Dell Networking S4100-ON Series Set-Up Guide
- About this guide
- Site preparations
- S4100–ON Series installation
- Unpack the system
- Unpack
- Rack or cabinet installation
- ReadyRails installation
- 1U Tool-less mount installation
- Two-post flush-mount installation
- Two-post center-mount installation
- Four-post threaded installation
- S4100-ON Series system installation
- 1U front-rack installation
- Optics installation
- Optics removal
- System power-up
- After system installation
- Specifications
- Dell support

Figure 2. Separate rails
1U Tool-less mount installation
NOTE
: For more installation instructions, see the installation labels attached to the rail assembly.
1 Face the ReadyRails ange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the back ange
rail pegs in the back vertical post ange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
S4100–ON Series installation
11