Setup Guide

Figure 9. S4048T–ON front-rack conguration installation
1
Chassis 2 Rail end
3 Rail locking feature
Ground wire installation
After you have installed the S4048T-ON switch in a rack, complete the installation of the
ground wire.
You previously installed the GND lug and bracket assembly, with ground wire attached, to
the S4048T-ON chassis, see Ground lug and bracket installation.
18
Hardware installation