Setup Guide
1U front-rack installation
Congure the rails that are attached to the system.
1 Attach the inner-chassis member switch rails to the switch, items 1 and 2.
Item 3 shows the detail for the front stando with the locking tab.
Figure 8. Switch rail attachment
1
Locking feature 2 Chassis
3 Front stando with locking tab
2 Line up the installed rails on the mounted ReadyRails. Slide the switch in the rack until it
is ush with front of rack, item 1.
About 3 inches before you fully insert your system, the rail locking feature engages. This
feature keeps the switch from inadvertently sliding out of the rack and falling, items 2
and 3.
Hardware installation
17